What this server can do
27 functions, named and described by the server itself. Parameter names are shown because they say more about what a function does than its name usually does.
assess_epbd_score(country, year_built, current_epc, has_solar_pv, building_type, floor_area_m2, heating_system)- Assess EU EPBD (2024) compliance. Returns compliance score, renovation cost estimate, deadline pressure, and priority retrofit measures. Required: building_type, year_built, current_epc, heating_system, has_solar_pv, floor_area_m2, country.
building_carbon_footprint(location, occupancy, year_built, refrigerant, gas_kwh_year, building_type, elec_kwh_year, floor_area_m2, heat_kwh_year, renewable_pct)- Building carbon footprint (Scope 1/2/3) with CRREM stranding check and embodied carbon. Returns per-scope tCO2e, intensity, CRREM compliance, net-zero gap and priority actions. Required: building_type, floor_area_m2, location, year_built.
building_readiness(bim, floors, location, condition, structure, year_built, current_use, proposed_use)- Building Readiness assessment for change-of-use / conversion. Returns a 0-100 readiness score, project complexity, four domain scores (structural, MEP, compliance, digital/BIM) with RAG, and recommendations. Required: current_use, proposed_use, year_built, structure, floors, condition, location, bim.
calculate_carbon(country, building_type, floor_area_m2, energy_kwh_year, construction_year)- Calculate operational + embodied carbon and net-zero gap (CIBSE TM65 / RICS WLCA). Returns carbon intensity, benchmark, and prioritised reduction measures with payback. Required: floor_area_m2, building_type, country.
calculate_pue(cooling_kw, it_load_kw, lighting_kw, ups_losses_kw)- Calculate Power Usage Effectiveness (PUE) for a data centre or server room. Returns PUE score, efficiency rating, annual cost estimate, and engineering recommendations. Required: it_load_kw, cooling_kw, ups_losses_kw, lighting_kw.
check_grid_feasibility_uae(intended_use, site_location, voltage_level, has_existing_supply, power_requirement_mw, target_completion_year)- Assess UAE grid connection feasibility (DEWA/ADDC/SEWA/FEWA). Returns feasibility score, connection timeline, recommended voltage, substation requirement, and next steps. Required: site_location, power_requirement_mw, voltage_level, intended_use, has_existing_supply, target_completion_year.
check_nis2_readiness(sector, has_ciso, has_ir_plan, has_ot_policy, has_24h_reporting, has_ot_monitoring, organisation_size, has_asset_inventory, has_board_reporting, has_supplier_assessment, has_network_segmentation)- Assess NIS2 Directive (EU 2022/2555) compliance readiness. Returns compliance score (0-18), maturity level, estimated fine exposure, and prioritised remediation actions. Required: has_ciso, has_ot_policy, has_board_reporting, has_asset_inventory, has_network_segmentation, has_ir_plan, has_24h_reporting, has_supplier_assessment, has_ot_monitoring, organisation_size, sector.
check_uae_bim_compliance(emirate, has_bep, ifc_export, bim_software, building_type, has_bim_model, building_floors, building_area_m2)- Check UAE BIM mandate applicability (Dubai Circular 196, Abu Dhabi DMT, Sharjah). Returns mandate status, compliance score, required LOD, and submission checklist. Required: building_area_m2, building_floors, emirate, building_type, has_bim_model, bim_software, ifc_export, has_bep.
check_uae_cybersecurity(emirate, has_isms, is_cloud_hosted, organisation_type, has_incident_response, has_third_party_audit, has_data_classification, has_vulnerability_assessment)- Assess UAE cybersecurity regulatory compliance (NESA IAS, Dubai ISR, CBUAE, TDRA). Returns applicable framework, compliance score, critical gaps, and mandatory controls. Required: organisation_type, emirate, has_isms, has_incident_response, has_vulnerability_assessment, has_third_party_audit, has_data_classification, is_cloud_hosted.
contractor_vetting(answers, purpose)- NIS2 / EPBD contractor vetting score from a 12-question checklist across financial, technical, cyber (NIS2) and energy (EPBD) categories. Flags blocking (critical) failures and returns recommended additional checks. Not a formal due-diligence report. Required: answers.
dgnb_bim_readiness(answers, cert_target)- DGNB certification pre-score and BIM (ISO 19650) maturity self-assessment from a 20-question checklist. Returns pre-score, achievable certification level, BIM level, domain breakdown and prioritised gaps. Not a formal DGNB audit. Required: answers.
digital_renovation_passport(era, address, country, heating, current_epc, building_type, floor_area_m2)- EPBD-style staged digital renovation passport: 3-phase roadmap (quick wins, system upgrades, deep renovation) with cost ranges, energy savings and EPC trajectory from current EPC, floor area and heating type. Indicative. Required: floor_area_m2, current_epc, heating.
eed_datacentre_pack(it_power_kw, it_energy_kwh, water_input_m3, reused_heat_kwh, total_energy_kwh, renewable_energy_kwh)- EU Energy Efficiency Directive data-centre reporting pack (Dir (EU) 2023/1791 Art.12 + Del. Reg (EU) 2024/1364). Determines reporting scope (IT power >= 500 kW) and computes the mandated KPIs PUE, WUE, ERF and REF. Note: the regulation mandates reporting, not target values. Required: it_power_kw, total_energy_kwh, it_energy_kwh.
estimate_cooling_load(it_load_kw, redundancy, space_type, climate_zone, floor_area_m2, occupancy_persons)- Estimate cooling load using CIBSE Guide B2 / ASHRAE methodology. Returns required capacity, installed capacity with redundancy, system recommendation, and annual energy. Required: space_type, floor_area_m2, it_load_kw, occupancy_persons, climate_zone, redundancy.
eu_cost_benchmarking(bim, country, programme, procurement, project_type, floor_area_m2, specification)- Parametric construction cost benchmark across UK/EU/GCC by country, project type, specification, procurement, programme and BIM. Returns per-m2 and total cost ranges plus a cost breakdown. Indicative parametric estimate, validate against current cost indices. Required: floor_area_m2, country, project_type.
eurocode_beam_designer(grade, config, span_m, exposure, material, udl_kn_m, fire_rating, load_position, point_load_kn)- Preliminary Eurocode beam design (steel EC3 / composite / reinforced concrete EC2). Selects a section, computes ULS bending & shear utilisation, SLS deflection, and fire protection. Indicative, not a stamped design. Required: material, config, span_m, udl_kn_m.
eurocode_column_checker(section, depth_mm, material, width_mm, axial_load_kn, buckling_curve, eccentricity_mm, reinforcement_pct, effective_length_m)- Eurocode axial column buckling check (steel EC3 6.3.1 flexural buckling / RC EC2 5.8 simplified). Returns Ncr, non-dimensional slenderness, reduction factor chi, NRd and utilisation. Indicative, not a stamped design. Required: axial_load_kn, effective_length_m, material.
get_technical_dd_quote(geography, disciplines, building_type, gross_area_m2, timeline_weeks, transaction_type)- Generate an indicative Technical Due Diligence (TDD) fee estimate. Returns preliminary and full DD fee ranges (GBP), turnaround days, and contact CTA. Required: building_type, gross_area_m2, transaction_type, disciplines, geography, timeline_weeks.
heatpump_heatloss(storeys, age_band, location, flow_temp_c, floor_area_m2, air_change_rate, ceiling_height_m, glazing_pct_of_floor, external_design_temp_c, internal_design_temp_c)- Domestic whole-dwelling fabric + ventilation heat-loss estimate for heat pump sizing (BS EN 12831 / MCS), from floor area, storeys, age band, location and glazing. Returns design heat loss (kW), recommended heat pump output, indicative SCOP and annual demand. Typical U-values/SCOP, not measured. Required: floor_area_m2, age_band, location.
mees_checker(property_type, current_epc_band)- England & Wales Minimum Energy Efficiency Standard (MEES) check for private rented property. Tests against the in-force EPC E minimum (domestic and non-domestic) and surfaces the PROPOSED (not yet law) EPC C / 2030 uplift as an advisory only. Returns compliance, can-let, cost cap and penalties. Required: property_type, current_epc_band.
part_o_overheating(floor_area_m2, location_risk, glazing_area_m2, cross_ventilation, most_glazed_facade, provided_free_area_m2)- UK Approved Document O 2021 simplified-method overheating check for new residential: tests maximum glazing area (by orientation, risk zone, cross vs single aspect) and minimum free ventilation area. Returns pass/fail and points to CIBSE TM59 modelling if it fails. Indicative. Required: location_risk, most_glazed_facade, floor_area_m2, glazing_area_m2.
part_s_ev(works, dwellings, building_type, parking_spaces, covered_car_park)- UK Approved Document S 2021 electric-vehicle charge-point requirement calculator for new build and major renovation, residential and non-residential. Returns required charge points, cable routes (1-in-5 for non-residential), minimum power and the applicable cost caps/exemptions. Indicative. Required: building_type, works, parking_spaces.
roi_calculator(team_size, hourly_rate, manual_hours, software_cost, efficiency_gain_pct, implementation_time_months)- Engineering ROI calculator. Returns current manual cost, annual saving, net benefit, ROI %, payback months, 3-year NPV and a verdict. Required: team_size, hourly_rate, manual_hours, efficiency_gain_pct, implementation_time_months.
sap_sbem_precheck(sap_rating, floor_area_m2, annual_energy_kwh)- UK SAP 10.3 / SBEM EPC precheck. Maps a known SAP rating (1-100) to its EPC band, and/or computes annual CO2 and primary energy from fuel consumption using validated SAP 10 fuel factors. The official EPC band is cost-based and needs a full SAP/RdSAP assessment.
thermal_load(it_load_kw, redundancy, lighting_kw, cooling_type, room_area_m2, ambient_temp_c, ups_efficiency_pct)- Thermal Load Estimator for data centres / critical facilities. Returns total heat load, cooling capacity, units, airflow, chiller size, PUE estimate, power density, and a CRAC/CRAH/DLC/immersion comparison. Required: it_load_kw, ups_efficiency_pct, room_area_m2, cooling_type, redundancy, ambient_temp_c.
uae_climate_ghg(gas_m3, emirate, gas_kwh, electricity_kwh)- UAE Scope 1 + Scope 2 GHG estimate from electricity and gas use, with emirate-specific grid emission factors (Dubai/Abu Dhabi/national) and the Federal Decree-Law No. 11 of 2024 mandatory-reporting context. Grid factors carry base-year/confidence caveats. Required: emirate, electricity_kwh.
uk_planning_checker(listed, location, proposal, article_4, use_class, proposed_use, property_type, conservation_area, extension_depth_m, national_park_aonb)- UK permitted-development (GPDO 2015, England) rules engine for extensions, loft conversions and change of use. Returns a verdict (likely_pd / requires_permission / complex), applicable PD class, conditions and flags (listed building, Article 4, conservation area, AONB). Indicative, verify with the LPA. Required: property_type, proposal.
Last successful function declaration observed on . Source: https://api.novtriq.tech/mcp. We list what the server declared; we do not call any of these functions.
Endpoint status observed on . Source: https://api.novtriq.tech/mcp.
Signals
These are separate measurements of different things. They are deliberately not combined into one score, because a popularity number that mixes website traffic with saves and stars cannot be checked or acted on.
| Signal | Value | What it measures | Window | Observed | Source |
|---|---|---|---|---|---|
| Latest published version | 1.0.0 | Latest version string the maintainer published to the registry. | as of fetch | Model Context Protocol | |
| Registry record last updated | 2026-07-26 | When the registry record was last updated by its maintainer. | point in time | Model Context Protocol | |
| First listed in the MCP Registry | 2026-07-26 | Date this server was first published to the official MCP Registry. Not a usage or quality measure. | point in time | Model Context Protocol | |
| mcp tools declared | 27 tools | Number of functions the server itself declared when asked to list them. This is what the server offers an agent, not a measure of how well any of them work. | as of probe | api.novtriq.tech | |
| mcp endpoint status | ok | The server listed 27 functions when asked. | as of probe | api.novtriq.tech |